Walley Lane Culvert Replacement over Factory Creek at Docker

IMG_3195.jpg

Waratah Constructions have been engaged to undertake works to replace the existing pipe culverts over Factory Creek with a new single-span bridge. The site is located on Walley Lane in Docker, approximately 500m from the Oxley-Greta West Road. Walley Lane will remain closed to through traffic between the limit of works. A temporary side track will be in place to provide access to residents. Works are now complete.

Before works:

IMG_2453 conv.jpeg

Progress Photos:

Walleys Bridge 1..jpg IMG_2990.jpg

IMG_3195.jpg IMG_3193.jpg